The Dau Tieng 3 solar power plant covers an area of 216 hectares in the semi-submerged area of Dau Tieng Lake. Due to the unique topography of the semi-submerged area, which is flooded for approximately 3-4 months annually, the Dau Tieng 3 solar power plant project required PESE engineers to meet not only professional requirements but also the ability to work in conditions where part of the plant is submerged.
Through their experience and efforts, PESE's O&M team consistently ensures the plant's operating parameters: availability factor (AF) always greater than 99% and performance factor (PR) above 79%.